Datumata
KRContact
J-406Engineering

Counting from the mark

How Datum produces a quantity: from marks on sheets to occurrences, from occurrences to objects, from objects to a takeoff line that opens back to the sheet it came from.

A quantity takeoff is usually a spreadsheet. Someone reads the drawings, counts and measures, and types in the results. The spreadsheet is the output, and the reasoning behind it lives in the estimator's head and a stack of marked-up prints. When a count is questioned, the only way to check it is to do it again.

Datum's Project capability produces quantities differently. Every line in a takeoff, BOM or work package is the end of a chain that starts at a mark on a sheet, and the whole chain is kept. This note describes the chain and why we built it that way.

Marks, occurrences, objects

The chain has four links.

  • Mark. Something drawn on a sheet: a valve symbol, a tag, a dimension, a line with a size callout. A mark has a sheet, a revision and a position.
  • Occurrence. Read's interpretation of a mark: this symbol is a 25A ball valve tagged V-1204. An occurrence keeps the mark it came from and a record of how it was read.
  • Object. One thing in the operation. V-1204 appears on the P&ID, on two piping isometrics and in the valve list. Graph decides that those occurrences are one valve and makes one object.
  • Quantity. Project counts and measures objects, never marks. The takeoff line for 25A ball valves is the set of objects of that kind in the selected scope.

Each link holds on to the one before it, so a takeoff line opens back to the sheets. Select the count to see the objects. Select an object to see every occurrence. Select an occurrence to see its mark highlighted on the sheet, at the revision it was read from.

Identity is a decision

The step that moves counts the most is the one from occurrences to objects. Count the same valve on a P&ID and an isometric twice and the BOM is wrong. Merge two different valves with similar tags and it is wrong the other way. Graph proposes each merge and shows its evidence: the same tag, the same size and spec, a connection to the same line. Where the evidence is strong and the case is routine, the merge follows rules the site's engineers have approved. Where it is not, the merge becomes a question for a person. Either way the decision is recorded, so the count can be explained.

We count objects, and every object opens down to the marks that made it.

What changes between revisions

When revision D of a sheet replaces revision C, Read compares the two mark by mark. Added, removed and moved marks change occurrences; changed occurrences change objects; changed objects change quantities. The result is a quantity diff that names the marks responsible. An estimator sees that the 25A valve count rose because two valves were added on one isometric, and goes straight to those two symbols.

In daily work this is where the chain matters most. A revision that once meant recounting a set becomes a short list of changes, each with its source.

Units and scope

Measured quantities carry their units and their basis. A pipe length measured along the centreline on an isometric is labelled as such, and a length scaled off a plan drawing is labelled differently. Scopes such as area, system, work package or 기성 period are filters on objects, so one model produces the bid quantity, the fabrication list and the monthly 기성 claim without three separate counts.

Example: a takeoff line opened back to its objects and the marks on the sheet.

None of this makes the reading perfect. It makes every error findable. When a number is wrong, the chain shows where it went wrong, and the fix is made once, at the source, and flows to every output that used it.

Model team

Related

  1. Offline updates for a closed networkEnclave runs inside networks that never touch the internet. This is how its software and models are updated there without a single outbound connection.
  2. A model that refuses to guessWhen Datum cannot read a mark or reconcile two sources, it stops and asks. A visible gap costs less than a confident wrong number.
  3. Where the agent stopsSteward assembles evidence and drafts changes. Engineers decide. The line follows where the hours go on a site and where the liability sits.