Semiconductors
A fab is built around its tools. Each tool needs gases, chemicals, ultrapure water, exhaust and power, delivered to a point on the floor.
- Documents
- Tool layouts, hookup drawings, P&IDs, vendor requirements
- Systems
- Utility matrix, BIM exports, construction schedule
- On site
- Datumata engineers with the facility team and hookup contractors
- Runs
- Closed fab network
A tool moved two bays east. Its gas lines were already on the hookup drawings for the old bay.
A layout that does not hold still
- Where it breaks
- Between tool layout and hookup
Tool layout, utility design and hookup run in parallel, often across several contractors. Each tool's requirements arrive from its vendor and change as the tool changes.
A tool slips its delivery date. A bay is reassigned to another process. Each change reissues drawings, and each reissue changes the material list, the work package and the progress quantities.
The utility matrix that ties this together is usually a spreadsheet kept by whoever has time.
A layout revision, followed
- 0.1Read
Datum reads the new tool layout, the hookup drawings and the utility matrix, and places each tool and its points of connection.
- 0.2Compare
The model compares this revision with the last approved one, tool by tool and utility by utility, and lists what moved.
- 0.3Draft
Steward drafts reroutes and change lists with the drawing marks behind them. The facility engineer for the bay decides.
- 0.4Reissue
Datum rebuilds the hookup material list, the work package per tool and the progress quantities. Each contractor receives its own scope.
In a cleanroom, the network ends at the wall
Enclave installs inside the fab network and runs its models on local hardware. Updates come in as offline bundles. The fab's security team inspects each bundle before it goes in.
Datumata engineers work under the fab's access rules, alongside the facility team.
- No telemetry
- Updates as offline bundles only
Inputs and outputs
| Input | Read as | Output |
|---|---|---|
| Tool layout | Tools, bays, points of connection | Layout diff by revision |
| Hookup drawings, P&IDs | Lines, valves, utilities per tool | Hookup material list |
| Vendor requirements | Flow, pressure, purity, exhaust | Requirement mismatches |
| Utility matrix | Status per tool and utility | Work package per tool |
Every tool on the floor waits for its last connection.
Footage: KS부동산TV · CC BY 3.0
Specification
Q01Deployment
Closed network, local models, no telemetry, offline updates. The fab's security team receives the architecture and the full list of running components.
Q02Critical lines
The fab designates which lines are critical, such as toxic or flammable gas. Changes on those lines follow the fab's own review rule.
Q03BIM
Datum returns changes as exports for the BIM team. It does not edit the BIM model directly.