Datumata
KRContact
P-102REV A · 2026-11In development

Steward

Steward drafts answers and changes against the Datum model. Each draft carries the sheets, rows and records it relied on.

Status
In development
Runs
With Datum, inside the customer's network or on Enclave
Inputs
Questions, change requests, the Datum model and its sources
Outputs
Cited answers and change proposals

Steward drafts. A person signs. Steward holds no signing key, so a change it writes enters the journal only after an engineer with authority over that change has read it and signed.

Capabilities

  1. 01ProposeDrafts changes to the model as proposals: a lowered tray, a merged tag, a corrected quantity. The model does not change while a proposal is open.
  2. 02CiteEvery answer and every proposal carries the sheets, rows and records it relied on, opened at the exact mark.
  3. 03SealWrites an accepted change to the journal with its time, revision and evidence. Critical changes wait for a second person.
  4. 04DelegateAn engineer can let Steward apply narrow, reversible changes inside a scope they define, and can revoke that delegation at any time.

What Steward does

Status
In development
Critical changes
Checked by two people

Much of an engineer's week goes into work that is necessary and slow: finding which sheet governs a dimension, checking a quantity against the schedule, drafting the same kind of change again. Steward takes on that drafting. It reads the Datum model and its sources, answers questions with citations, and writes changes as proposals.

A proposal shows the change and its reason side by side. If Steward suggests lowering a cable tray to clear a duct, the proposal opens on the section where the clash sits, the schedule that gives the duct size and the clearance rule it applied. The reviewer sees what Steward saw.

The journal records each change with its time, revision and evidence. Views, exports and reports are rebuilt from the journal, so a figure in a report opens to the change that produced it and the draft it started from.

Steward is in development. Its first tasks are narrow: cited answers, tag renames, clash proposals. Accepted and rejected drafts are both recorded, and a new task is added only where that record supports it.

Delegation that can be taken back

Some changes are routine and reversible: renaming tags to a convention, attaching inspection records to the equipment they belong to. An engineer can hand work like this to Steward within a scope they write down.

The delegation is itself a journal entry. It names the engineer, the scope and the end date. Every change made under it is recorded against that delegation, and revoking it stops further changes at once.

  • Scope written by the delegating engineer
  • Reversible changes only
  • Revoked in one action, effective immediately
  • Every delegated change journaled

From question to change

  1. 0.1Ask

    An engineer asks a question or files a change request in plain language. Steward reads the request against the Datum model and finds the sheets and records that bear on it.

  2. 0.2Draft

    Steward writes an answer or a proposal and cites each source at the mark. Where the sources disagree, it says so and leaves the choice to a person.

  3. 0.3Review

    The reviewer opens the proposal on the drawing, checks the citations and edits the draft where needed. A rejection is recorded with its reason, and later drafts take that reason into account.

  4. 0.4Sign

    The engineer signs, and the change enters the journal. A critical change waits until a second person, other than the first, has checked it.

  5. 0.5Rebuild

    Quantities, BOMs and reports are rebuilt from the journal. Each figure opens to the entry behind it.

What Steward will not do

Signing key
None
Answers without sources
Refused

Steward cannot approve work or start it, and it has no path to the journal except through a person. That limit is part of the design, and it does not loosen as the models improve.

It will not answer without sources. When the model and its documents do not support an answer, Steward says it does not know and shows what it searched.

It will not act beyond a delegation, and no delegation covers critical changes. Those always go to a person, and then to a second person.

Specification

Q01Who is accountable when an accepted change turns out to be wrong?

The engineer who accepted it, as with any engineering document today. The journal holds exactly what they were shown: the proposal, its citations and the revision it applied to, so review after the fact means reading the record.

Steward's part in the change is recorded too, so the team can tell whether the error came from a bad draft or a missed check.

Q02Which models does Steward use?

Models that run where the customer's data runs. On Enclave, they are hosted inside the customer's network. Models are chosen per task, and each proposal records which model drafted it.

Q03Who defines a critical change?

The customer. Categories are usually set by system, value or safety class, and each category names who gives the second check.

Q04How are rejections used?

Rejections and their reasons stay in the customer's journal and shape later drafts for that team. They are not used to train models for other customers.

A fixture change on a parts assembly line starts as an engineering change request.

illustration

Footage: 단디메카 DHANDY MECHA · CC BY 3.0