Plants & EPC
A process plant starts as P&IDs, line lists and specifications. An EPC contractor prices it from those documents, often in weeks.
- Documents
- P&IDs, line lists, piping class specs, isometrics
- Systems
- 3D model exports, estimating sheets, procurement lists
- On site
- Datumata engineers with piping and estimating
- Runs
- Inside the contractor's network
The P&ID showed a 6-inch line. The line list said 4. The bid had to carry one of them.
Plants are built from documents that disagree
- Where it breaks
- Between bid and execution
The owner issues a bid package of hundreds of P&IDs, a line list, class specs and a datasheet for each item of equipment. The documents were written by different people at different times.
Estimators take off pipe by hand and settle each disagreement as they meet it. The assumptions live in their heads and in cell comments. On award, the project team starts the takeoff again.
A bid package, followed
- 0.1Read
Datum reads the P&IDs, line list and class specs, and builds each line with its size, class and service.
- 0.2Compare
The model flags each line where the documents disagree and shows both sources side by side.
- 0.3Query
Steward drafts a technical query for each disagreement, citing the sheets, and the assumption the bid carries if the owner does not answer in time.
- 0.4Count
Datum produces the MTO from the model. Each quantity links to its P&ID mark, line list row and assumption.
One model from bid to construction
When the owner asks where a quantity came from, the estimator opens it and shows the P&ID mark, the line list row, the class spec and the assumption.
On award the project team inherits the same model. Datumata engineers stay with piping as the isometrics come out of the 3D model and check them against the P&ID revision.
- Every assumption attached to its quantities
- Isometrics checked against the P&ID revision
Inputs and outputs
| Input | Read as | Output |
|---|---|---|
| P&IDs | Lines, valves, instruments, equipment | Line model |
| Line list | Size, class, service, design conditions | Disagreement list |
| Piping class specs | Materials, ratings, fittings | MTO by class |
| Isometrics | Spools and BOMs from the 3D model | Isometric check against P&ID |
Every line on the P&ID is a pipe someone has to buy.
Footage: 문화창조, 매일 행복하세요! · CC BY 3.0
Specification
Q01Deployment
Enclave installs inside the contractor's network. Owner documents stay there. No telemetry leaves.
Q02Submissions
Steward drafts queries and assumptions. It does not submit anything to the owner. The bid basis is set by the estimating lead.
Q033D model
The 3D model remains the design tool. Datum reads its isometrics and BOMs and checks them against the process design.