A week on a fab utility set

A composite field note: five days with a facility team and the sub-fab utility drawings for one bay.

This note is a composite. It describes a typical week inside a fab facility team. No customer, site or person in it is real, and every number in it is illustrative.

The set

A slice of the sub-fab utility drawings for one bay: process cooling water (PCW), ultrapure water (UPW), general exhaust and two specialty gas lines, about forty sheets with their line lists and equipment schedule. The facility team also keeps the hookup quantities its own engineers counted on a past project, which gives the week something to check against.

Monday: inside the network

The day starts with the site's security induction and badge issue. Cameras and personal devices stay at the gate. Enclave runs on a server inside the facility network. The field engineer confirms the install, checks the latest bundle together with a member of the IT security team, and loads the set. Nothing is copied out, and for the rest of the week the engineer works on a site-issued terminal.

Tuesday: first read

Datum reads the set overnight. In the morning the field engineer and one facility engineer go through the first results together, sheet by sheet, before anyone looks at totals. The point is to learn the site's drafting conventions: how this team marks a valve that is in the line list but not on the drawing, which tag prefix means a spare connection, which older sheets still use a symbol that has dropped out of the legend. In this example there are around a dozen such conventions, and each becomes a written rule the facility engineer reviews.

Wednesday: the conflict list

With the conventions settled, Graph links the sheets, the line lists and the equipment schedule. The output that matters most today is the conflict list: every place where two documents disagree. In this example it holds a few dozen items. Some are drafting slips. Some are real, such as a PCW branch sized differently on the drawing and in the line list, or a hookup still drawn for a tool that left the equipment schedule two revisions ago.

Most of the conflict list is already known to someone on the team. The list puts it in one place, with sources.

Thursday: questions to people

Datum has left a set of items unresolved and routed each one as a question: a scanned sheet where a size is unreadable, a reference to a detail sheet that was not in the set, two occurrences that may or may not be the same valve. The field engineer walks the list with the facility engineer who owns each system. Most are answered at the desk; a few need a call to the design office. Every answer is recorded with who gave it, and the quantities update.

Friday: against the old count

The week ends with a comparison against the facility team's own counts. For each hookup quantity there are three outcomes: matched, different or still open. Differences are reviewed one at a time to find which link in the chain failed. In this example most trace back to two drafting conventions nobody mentioned on Tuesday, and those become new rules. Some trace back to the old count itself. The facility manager gets a short note with the conflict list, the open questions and the new rules.

Example: a sub-fab utility bay, with PCW and exhaust hookups traced back to their sheets.

What the week is for

The week is less about the software than about the site. A field engineer who has learned how one facility team draws, names and revises its systems turns that knowledge into rules, and the rules go back into Datum. The next facility starts further along.

Field engineering

Related

  1. Korea builds the world's ships, chips and batteriesDatumata builds the software they are built with. Why the company exists, and why it is built here.
  2. Offline updates for a closed networkEnclave runs inside networks that never touch the internet. This is how its software and models are updated there without a single outbound connection.
  3. A model that refuses to guessWhen Datum cannot read a mark or reconcile two sources, it stops and asks. A visible gap costs less than a confident wrong number.