A model that refuses to guess
When Datum cannot read a mark or reconcile two sources, it stops and asks. A visible gap costs less than a confident wrong number.
Language models are built to produce an answer. Ask one for the size of a line on a poor scan and it will usually give one, in the same tone it uses when it is certain. In a chat assistant that is an annoyance. In a BOM bound for a fabrication shop it is a defect, because a wrong size that looks right passes review and gets cut in steel.
Datum is built to do the opposite when the evidence is missing. When it cannot read a mark, when sources disagree, or when an identity is unclear, it leaves the gap unfilled. It records the gap as an open question, attaches the evidence it has, and routes it to a person.
When the model stops
The reasons fall into a few kinds, and each kind is handled the same way every time.
- Illegible. The mark is there, but the scan, the line weight or an overlapping note makes it unreadable. Datum shows the cropped region with its best candidates and marks the occurrence unresolved.
- Conflicting. Two sources give different values for the same attribute, such as 50A on the P&ID and 40A in the line list. Both are kept, and neither wins by default.
- Missing. A sheet refers to a detail, a continuation or a schedule that is not in the set. The reference is recorded and the gap is listed.
- Ambiguous identity. Two occurrences may or may not be the same object, and the evidence does not settle it. The merge waits for a person.
- Out of scope. The mark belongs to a discipline or system outside what the customer asked us to model. It is recorded and left alone.
An open question carries everything needed to answer it: the marks, the sheets, the revisions, the candidate values and the objects that depend on the answer.
Why a blank beats a guess
The cost of an error depends on when it is found. A blank in a takeoff is found at once, because it is visibly blank. A wrong number is found when the spool does not fit, when the cable tray comes up short, or when the 기성 claim fails audit. By then it costs rework, a change order or a dispute.
A visible gap is found at the desk. A confident wrong number is found on site.
There is a trust cost as well. An engineer who once catches a model inventing a value will check every value after that, and the software stops saving time. A model that states plainly what it does not know is a model whose answers people can rely on.
Counting both kinds of error
Every read is checked against reference sets drawn from the site's own records and counted three ways: correct, wrong and abstained. Wrong answers are the expensive ones, so driving them down comes first, even when that means more abstentions early on.
Abstention has a cost too. Every open question is an engineer's time, and a model that abstained on everything would be safe and useless. The aim is the narrowest set of questions that still keeps wrong answers out, and both counts sit side by side so the trade-off stays visible.
As engineers answer questions, their answers become site rules: this drafting convention means this, that vendor's tag format maps to that. Abstentions fall because the model has learned the site's documents. It has not become any more willing to guess.
A model that refuses to guess is what makes the rest of its numbers usable.
Model team