Construction & MEP
On a building site the same drawings are counted by the general contractor, by each MEP subcontractor and by the owner's reviewer.
- Documents
- Design and shop drawings, bills of quantities, specifications, change orders
- Systems
- Estimating sheets, BIM exports, progress claims
- On site
- Datumata engineers in the site office with MEP managers
- Runs
- Contractor servers or site network
Three firms counted the same ductwork. They arrived at three totals, and each could show its spreadsheet.
The same drawing, counted three times
- Where it breaks
- At each progress claim and change settlement
MEP work is split across subcontractors for piping, ductwork, electrical, fire protection and plumbing. Each counts its own quantities against the bill of quantities the contract was priced on.
A change order moves a riser, and every quantity downstream is recounted for the settlement. The firm that shows the before and after, mark by mark, is the firm that gets paid for the change.
A floor, counted once
- 0.1Read
Datum reads the design and shop drawings for each trade: ducts, pipes, trays, fittings, hangers and equipment. Each item keeps its link to the mark it came from.
- 0.2Find clashes
The model places the trades together in 3D and flags where a tray runs through a duct.
- 0.3Draft
Steward drafts a resolution for each clash, such as raising a tray, and shows the quantities that change. The MEP site manager decides.
- 0.4Count
Datum counts from the approved revision and builds the progress claim. Each metre links to a mark.
A claim checked by opening it
In a progress claim built this way, the contractor checks a number by opening the marks behind it. Change settlements use the same trail: before and after, mark by mark.
Datumata engineers sit in the site office during coordination and settlement, where the counts meet.
- Quantities counted once, from the drawings
- Clash resolutions counted after approval
Inputs and outputs
| Input | Read as | Output |
|---|---|---|
| Design drawings | Systems, routes, equipment | Quantity model per trade |
| Shop drawings | Fittings, hangers, lengths | Clash list |
| Bill of quantities | Contract line items | Progress claim by line item |
| Change orders | Moved and added items | Before-and-after settlement |
Every metre in a progress claim was once a line on a sheet.
Footage: Sururi Ballıdağ Director · Pexels License
Specification
Q01Shared models
A subcontractor and a general contractor can work from one model, each with its own permissions.
Q02Deployment
Enclave installs on the contractor's servers or on the site network. Drawings stay there.
Q03Formats
PDF and CAD drawings, BIM exports, bills of quantities as spreadsheets. Claims return in the contractor's claim format.