Datumata
KRContact
I-205REV A · 2026-11

Construction & MEP

On a building site the same drawings are counted by the general contractor, by each MEP subcontractor and by the owner's reviewer.

Documents
Design and shop drawings, bills of quantities, specifications, change orders
Systems
Estimating sheets, BIM exports, progress claims
On site
Datumata engineers in the site office with MEP managers
Runs
Contractor servers or site network

Three firms counted the same ductwork. They arrived at three totals, and each could show its spreadsheet.

The same drawing, counted three times

Where it breaks
At each progress claim and change settlement

MEP work is split across subcontractors for piping, ductwork, electrical, fire protection and plumbing. Each counts its own quantities against the bill of quantities the contract was priced on.

A change order moves a riser, and every quantity downstream is recounted for the settlement. The firm that shows the before and after, mark by mark, is the firm that gets paid for the change.

A floor, counted once

  1. 0.1Read

    Datum reads the design and shop drawings for each trade: ducts, pipes, trays, fittings, hangers and equipment. Each item keeps its link to the mark it came from.

  2. 0.2Find clashes

    The model places the trades together in 3D and flags where a tray runs through a duct.

  3. 0.3Draft

    Steward drafts a resolution for each clash, such as raising a tray, and shows the quantities that change. The MEP site manager decides.

  4. 0.4Count

    Datum counts from the approved revision and builds the progress claim. Each metre links to a mark.

A claim checked by opening it

In a progress claim built this way, the contractor checks a number by opening the marks behind it. Change settlements use the same trail: before and after, mark by mark.

Datumata engineers sit in the site office during coordination and settlement, where the counts meet.

  • Quantities counted once, from the drawings
  • Clash resolutions counted after approval

Inputs and outputs

InputRead asOutput
Design drawingsSystems, routes, equipmentQuantity model per trade
Shop drawingsFittings, hangers, lengthsClash list
Bill of quantitiesContract line itemsProgress claim by line item
Change ordersMoved and added itemsBefore-and-after settlement

Every metre in a progress claim was once a line on a sheet.

illustration

Footage: Sururi Ballıdağ Director · Pexels License

Specification

Q01Shared models

A subcontractor and a general contractor can work from one model, each with its own permissions.

Q02Deployment

Enclave installs on the contractor's servers or on the site network. Drawings stay there.

Q03Formats

PDF and CAD drawings, BIM exports, bills of quantities as spreadsheets. Claims return in the contractor's claim format.