Datumata
KRContact
J-401Essay

Korea builds the world's ships, chips and batteries

Datumata builds the software they are built with. Why the company exists, and why it is built here.

Korea builds a large share of the world's ships, memory chips and batteries, and it does so in a small number of dense places: the yards on the southeast coast, the fab clusters in southern Gyeonggi, the petrochemical complexes in Ulsan and Yeosu, and the contractors who build and maintain all of them. Each of these places runs on documents, and each has rules about where those documents may go.

The software these places run on was mostly built somewhere else, for a setting where the vendor hosts the system, documents are in one language and one company owns the whole project. Those assumptions fail at the first meeting with a security team. Datumata exists to build the software Korea's industry is built with, here and on Korea's terms, with engineers who work inside the yards, fabs and plants instead of visiting them.

The conditions

Four conditions shape everything we build.

  • Closed networks (폐쇄망). Fabs, yards and many plants separate their engineering networks from the internet. A system that needs to reach an outside service cannot be installed, however good it is.
  • Mixed-script documents. Drawings carry English tags and notes; spec books, 물량 산출서, inspection reports and 기성 claims are written in Korean. The same valve appears in both.
  • Payment against quantities. Contractors are paid through 기성 against measured 물량. A quantity is a commercial claim, and it has to survive an audit.
  • Tiers of companies. One drawing set passes from owner to EPC to MEP contractor to fabrication shop, and each tier keeps its own copy and its own changes.

None of these is exotic. Together they decide whether software works on a Korean site or stays in the demo room.

What we build differently

Enclave runs inside the customer's network from the first day. Models run on the customer's hardware. Updates arrive as offline bundles that the customer's own security team inspects and carries in, and no telemetry leaves the site. The platforms were designed from the start to be installed this way.

Datum reads Korean and English as equals. A tag on an English-language P&ID and the same item in a Korean 설비 일람표 resolve to one object, with both sources kept. Korean trade terms stay Korean inside the model, because those are the words the people doing the work use.

Datumata engineers work on site for long stretches. They sit with the facility team or the estimating desk, find the hardest problem the operation has, and build the product backwards from it. What they learn goes into the platforms, so the next site starts further along.

Korean data stays in Korea, and the customer decides where it lives, who reads it and when it is deleted.

Whose data it is

Data sovereignty is often argued as a question of which country a model was trained in. For a plant owner the practical question is narrower: where the drawings sit, who can read them and who can take them out. Datumata's answer is the same in every installation. The documents and the model built from them stay on infrastructure the customer chooses, in Korea. Nothing is copied out for training. The customer sets retention and deletion, and the journal shows every access.

A hull block and its documents: Korean spec text and English tags in one model.

Building here is a constraint we chose. A platform that works inside a Korean fab's network, on mixed-language documents, under 기성 audit, will work in most industrial settings. The reverse rarely holds.

Company

Related

  1. Documents are the ground truthAn industrial operation already has a model of itself, spread across drawings, spec books, schedules and exports. We build from those documents instead of asking anyone to draw the plant again.
  2. Offline updates for a closed networkEnclave runs inside networks that never touch the internet. This is how its software and models are updated there without a single outbound connection.
  3. A week on a fab utility setA composite field note: five days with a facility team and the sub-fab utility drawings for one bay.