Shipbuilding

A yard builds a ship in blocks and outfits each block before erection. Design keeps revising drawings while the shops cut steel and pipe.

Documents
Block drawings, outfitting drawings, pipe isometrics, change notices
Systems
3D design exports, ERP material master, production schedule
On site
Datumata engineers beside production design and the pipe shop
Runs
Inside the yard network

Design issued revision F on Tuesday. The pipe shop had already cut to revision E on Monday. The yard found out when the spool would not fit the block.

How a revision travels through a yard

Where it breaks
Between production design and the shops
Found today
At fit-up, by hand

Basic design hands over to detail design, and production design cuts the ship into blocks, units and work packages. Each step keeps its own system and drawing set. The pipe shop works from spool sheets. Outfitting works from arrangement drawings and material lists.

The erection schedule sets when each block must be finished. Production starts before design is final, on purpose. Change notices arrive while spools are being cut and supports welded.

A notice names the drawing that changed. It does not name the spools already cut, the supports already welded, or the valves already issued from the warehouse.

A change notice, followed

  1. 0.1Read

    Datum reads the notice, the revised isometrics and the spool sheets, and lists every spool, support and valve the change touches.

  2. 0.2Link

    Each spool is linked to its line, block and revision, and to its shop status: issued, cut, welded or fitted.

  3. 0.3Draft

    Steward drafts an impact list per block: scrap, rework or hold, with the sheet marks behind each line. Production design decides.

  4. 0.4Reissue

    Datum rebuilds the work package, spool list and material requisition. The shop receives the revision it should be cutting to.

Engineers in the yard

Datumata engineers work in the yard, next to production design and the pipe shop. They follow change notices from the design office to the quay and write down where each one stalls.

What they find goes back into Datum. The yard's design systems stay where they are. Datum reads their exports and keeps one definition of each spool current.

  • Spool, line, block and revision held as one record
  • Shop status read from the yard's own systems

Inputs and outputs

InputRead asOutput
Pipe isometrics, spool sheetsSpools, lines, supports, revisionsSpool list per block
Change noticesDrawings changed, items touchedImpact list: scrap, rework, hold
ERP material masterValves and fittings issuedRevised material requisition
Production scheduleBlock erection datesChanges ranked by erection date

A ship is built in blocks. Every block is built from drawings.

illustration

Footage: 문화창조, 매일 행복하세요! · CC BY 3.0

Specification

Q01Deployment

Enclave installs Datum and Steward inside the yard network. Models run on the yard's servers. Updates arrive as offline bundles. No telemetry leaves.

Q02Formats

PDF and raster drawings, 3D design exports, spool sheets, ERP tables. Outputs return as files and tables in the formats each team already uses.

Q03Design systems

Datum does not replace the 3D design system or the ERP. Design stays in the design system.