Infrastructure
A bridge, a tunnel or a substation built forty years ago carries forty years of drawings, inspection reports and repairs, in paper and in scans.
- Documents
- As-built drawings, inspection reports, repair records
- Systems
- Asset registers, document archives
- On site
- Datumata engineers with the asset owner's engineers
- Runs
- Agency network, data kept in Korea
The 2009 inspection found a crack at pier 4. The 2014 report described the same crack at pier 5.
A history read one report at a time
- Where it breaks
- Between one inspection and the next
Inspections follow a statutory cycle, and each one is written by a different firm. Repairs change the structure, and the as-built drawings are not always redrawn.
A repair decision, a load rating or a replacement budget depends on reading that history in order. Today that means pulling reports from an archive, one by one, against an inspection or budget deadline.
One structure, read in order
- 0.1Read
Datum reads the as-built drawings, every inspection report and every repair record, scans included.
- 0.2Link
Each finding is placed on its member: pier, girder, segment, panel. The model shows the member's history as one timeline.
- 0.3Draft
Steward drafts a condition summary per member, citing each report, and flags records that contradict each other.
- 0.4Record
The responsible engineer reviews the summary, as inspection rules already require. Datum updates the asset record from what is accepted.
Public records stay in Korea
Enclave installs inside the agency's network or on infrastructure the agency approves. Models run locally. Updates arrive as offline bundles. No telemetry leaves.
Datumata engineers work with the agency's engineers through an inspection cycle, starting from the archive.
- The agency decides who reads what
- Data kept in Korea
Inputs and outputs
| Input | Read as | Output |
|---|---|---|
| As-built drawings | Members, dimensions, materials | Member model |
| Inspection reports | Findings per member and date | Condition timeline |
| Repair records | What was repaired and replaced | Updated as-built record |
| Asset register | Asset identity and grade | Contradiction list |
A bridge outlives every firm that inspected it.
Footage: Handong Seo · CC BY 3.0
Specification
Q01Deployment
Agency network or agency-approved infrastructure in Korea. Local models, offline updates, no telemetry.
Q02Scanned records
Datum reads scanned and handwritten reports. Each extracted finding keeps a link to the page it came from.
Q03Asset register
Steward does not change the asset register or approve repairs. Those stay with the agency under existing inspection rules.