A bridge, a tunnel or a substation built forty years ago carries forty years of drawings, inspection reports and repairs, in paper and in scans.

Documents
As-built drawings, inspection reports, repair records
Systems
Asset registers, document archives
On site
Datumata engineers with the asset owner's engineers
Runs
Agency network, data kept in Korea

The 2009 inspection found a crack at pier 4. The 2014 report described the same crack at pier 5.

A history read one report at a time

Where it breaks
Between one inspection and the next

Inspections follow a statutory cycle, and each one is written by a different firm. Repairs change the structure, and the as-built drawings are not always redrawn.

A repair decision, a load rating or a replacement budget depends on reading that history in order. Today that means pulling reports from an archive, one by one, against an inspection or budget deadline.

One structure, read in order

  1. 0.1Read

    Datum reads the as-built drawings, every inspection report and every repair record, scans included.

  2. 0.2Link

    Each finding is placed on its member: pier, girder, segment, panel. The model shows the member's history as one timeline.

  3. 0.3Draft

    Steward drafts a condition summary per member, citing each report, and flags records that contradict each other.

  4. 0.4Record

    The responsible engineer reviews the summary, as inspection rules already require. Datum updates the asset record from what is accepted.

Public records stay in Korea

Enclave installs inside the agency's network or on infrastructure the agency approves. Models run locally. Updates arrive as offline bundles. No telemetry leaves.

Datumata engineers work with the agency's engineers through an inspection cycle, starting from the archive.

  • The agency decides who reads what
  • Data kept in Korea

Inputs and outputs

InputRead asOutput
As-built drawingsMembers, dimensions, materialsMember model
Inspection reportsFindings per member and dateCondition timeline
Repair recordsWhat was repaired and replacedUpdated as-built record
Asset registerAsset identity and gradeContradiction list

A bridge outlives every firm that inspected it.

illustration

Footage: Handong Seo · CC BY 3.0

Specification

Q01Deployment

Agency network or agency-approved infrastructure in Korea. Local models, offline updates, no telemetry.

Q02Scanned records

Datum reads scanned and handwritten reports. Each extracted finding keeps a link to the page it came from.

Q03Asset register

Steward does not change the asset register or approve repairs. Those stay with the agency under existing inspection rules.