Documents are the ground truth
An industrial operation already has a model of itself, spread across drawings, spec books, schedules and exports. We build from those documents instead of asking anyone to draw the plant again.
Every plant, yard and fab already describes itself in detail. The description lives in drawings and P&IDs, line lists and equipment schedules, spec books, BOMs, ERP and MES exports, inspection records and the monthly 기성 package. It is scattered, partly contradictory and split across a dozen systems. It is also the description that contracts, payments and safety reviews actually rest on.
Many digital projects start by setting that description aside. A team builds a new model, often in a new tool, and asks the operation to keep it current. For a while the new model is cleaner than the documents. Then the documents keep changing, because they are what people sign and get paid against, and the new model falls behind. Within a year there are two descriptions of the plant, and the one that counts is still the paper one.
Start where the authority is
Datum works the other way. It builds one model of the operation from the documents the company already has, and keeps every element tied to where it came from. A pump in the model is a pump because a mark on a P&ID, a row in an equipment schedule and a line in a purchase order say so, and all three stay attached. When a source is revised, the model knows which elements rested on it.
This matters because authority in an industrial operation sits in documents. A contractor is paid on the quantities in a signed 기성 package. A change to a line takes effect when the revised drawing is issued. A model that cannot trace back to those documents may be accurate and still carry no weight in a dispute or an audit.
A number without a source is an opinion. On a site, opinions do not get paid and do not pass inspection.
Conflicts are information
Documents disagree. The P&ID shows a 50A line and the line list says 40A. The equipment schedule gives a motor one rating and the vendor datasheet gives another. The usual response is to pick one quietly and move on. Datum records the conflict instead, with both sources, both values and the elements affected, and routes the question to the person who can answer it.
The conflict list shows where the documents have drifted apart. That is usually where field rework, change orders and claims come from later.
Revisions are part of the record
Documents change over time, and the history matters as much as the latest state. A 기성 claim from March was made against the drawings issued in March. A model that knows only the current revision cannot explain an old payment or an old inspection. Datum keeps every revision it has read and records which revision each element and each decision rested on. Ask what the model said on a given date, against the documents issued by then, and the answer is exact.
Why drawings come first
Datum starts from drawings for a plain reason: every plant has them, however small. A battery line built last year and a process unit built in the 1990s both have drawing sets, even if one is native CAD and the other is scanned paper. Not every site has a clean ERP or a working MES. Drawings are the source every site has.
Drawings are where we start, not what we are. Once the set is read and graphed, the same model takes in schedules, BOMs, ERP exports and inspection records and links them to the same objects. The aim is one model of the operation that every desk uses, with every number in it traceable to a source.
The documents were always the ground truth. They were simply too many to read at once. That is the problem we work on.
Company